MBM Prestige 350 in Commissioning
Every new boat delivered by Ancasta undergoes a rigorous 2 week commissioning process. This includes:
Unloading, block off, unwrap and build up
Arrival Inspection
Key, prime and antifouling
Launch, compass swing and sea trials
Pre-delivery inspection of all engines; systems and electronics
signwriting and comprehensive valeting and polishing as required.
In addition all dealer fit accessories are added to the boat.
For the NEW BLUE FIN this included a host of RAYMARINE equipment including the new e7 and e9 Hybridtouch Multifunction displays, 2 i70 instrument displays, 4kw 18″ HD digital Radome and 600W Dual station Raymic.
MASTERVOLT equipment was also fitted:
A Master-Combi 2500 Inverter charger,
Masterview battery monitor and
Mastershunt 500
Following this the boat was launched and tested by our Volvo and Prestige factory trained technicians.
These preparations all lead to the much anticipated Handover Day where there were some very excited journalists who couldn’t wait to get their hands on her!
Follow this story as the season progresses both at www.ancasta.com and with Motor Boats Monthly: online and in the magazine.